Completion date: September 28, 2026
Location: Loveland, OH
The property owner requested post-mitigation reconstruction and trim reinstallation services ("put back") following water damage restoration across their bathroom, hallway, and adjoining carpeted living spaces.
Our reconstruction team conducted a pre-installation evaluation of the affected rooms. We inspected the lower wall trim lines where baseboards were detached during structural drying, assessed door frame casing gaps and carpet transition edges, cleared stored personal items, and prepared a detailed scope of work to re-install baseboard moldings, touch up door casing paint, and finalize interior reconstruction.