Completion date: September 28, 2026
Location: Morrow, OH
The property owner requested post-mitigation reconstruction and floor replacement services following water mitigation that required removing affected floor coverings and baseboards throughout the hallway and adjoining doorways.
Our construction team performed a post-mitigation site inspection across the hallway and doorway entrances. We evaluated the exposed concrete subfloor, inspected door frame casing gaps and baseboard trim alignment, confirmed structural dryness, and prepared a full reconstruction scope to install new flooring, refit baseboard moldings, touch up door trim, and complete final site cleanup.