Completion date: September 28, 2026
Location: Liberty Township, OH
The property owner requested post-mitigation reconstruction and repair services following water mitigation demolition that required opening the ceiling and interior wall to address an overhead plumbing leak.
Our reconstruction team evaluated the exposed ceiling joists, overhead PVC plumbing lines, and open timber wall framing near the doorway. We verified that the surrounding structural framing and floor tile were fully dried, prepared a reconstruction plan to install new ceiling and wall drywall, tape and finish joints, reinstall door trim, and paint the affected surfaces to return the area to pre-loss condition.