Completion date: September 30, 2026
Location: Cincinnati, OH
The property owner requested post-mitigation content resetting and flooring replacement evaluation following water mitigation and floor removal in the bathroom and adjoining living areas.
Our restoration team conducted a final post-mitigation inspection to prepare for structural reinstallation. We evaluated exposed concrete subflooring and vinyl floor transitions at door jambs, inspected built-in cabinetry and vanity bases for complete drying, detached temporary power runs, and drafted a scope of work for new flooring installation, baseboard trim re-installation, and full content resetting.