Completion date: September 30, 2026
Location: Monroe, OH
The property owner requested post-mitigation reconstruction and repair services ("put back") following severe structural and vehicle/impact damage to the garage wall, exterior vinyl siding, framing, and interior drywall.
Our construction and restoration team executed a comprehensive structural put-back plan. We secured the impacted garage area, removed damaged wall studs, torn insulation, and buckled vinyl siding panels, repaired the structural wall framing, re-hung and taped new interior drywall, re-installed exterior siding with proper weatherproofing, and re-mounted outdoor lighting fixtures to restore the garage to pre-loss condition.